New development of a skid with dryer and purifier DN350 in Tashkent, Uzbekistan
Customer:
GEA Brewery Systems GmbH
Service:
Structural calculation and design of the vessels acc. to AD2000 Merkblätter and of the skid acc. to EN 1993-1 under seismic load acc. to UBC 1997 as well as anchorage acc. to EN 1992-4
„We need qualified personnel to manage the complex tasks in the future infrastructure planning.“
CEO Frank Mantel
Our new office spaces
The new office building in Rosenstrasse in Margetshöchheim offers our employees plenty of room and optimal working conditions.
Optimizing the PUR plate
As a consulting engineering firm, we are supporting Deutsche Telekom in optimizing the cable duct entry plate made of reinforced polyurethane integral foam for large concrete shafts.
Trip to the precast plant
In 2025 we went to the precast plant in Luckenwalde with the MF Engineering team. The focus was on exchanging technical experience with employees from Köhler Beton.