New development of an incineration plant (combustor, heat exchanger, gas purification) in Mexico
Customer:
Michaelis GmbH&Co. KG
Service:
Structural calculation and design of different parts of the plant incl. anchoring in the foundation acc. to AISC 360 LRFD under consideration of Mexican loading codes
„We need qualified personnel to manage the complex tasks in the future infrastructure planning.“
CEO Frank Mantel
New set of jerseys for the children of the soccer club
As an enterprise in Margetshöchheim, the development of our town matters to us. Thus, we support the local soccer club with this new set of jerseys.
Optimizing the cable duct entry plate
As a consulting engineering firm, we are supporting Deutsche Telekom in optimizing the cable duct entry plate made of reinforced polyurethane integral foam for large concrete shafts.
Trip to the precast plant
We've had two informative and interesting days. We went to the precast plant in Luckenwalde with the MF Engineering team. The focus was on exchanging technical experience with employees from Köhler Beton.