New development of segmented partially trafficable prefabricated hood chambers with subsequent masonry as replacement for to be rehabilitated underground chambers
Customer:
Klaus Köhler Beton- und Fertigteilwerk GmbH
Service:
Structural calculation of elastically bedded prefabricated concrete structures with masonry walls loaded by earth pressure and vehicle load acc. to DIN EN 1997, DIN EN 1992 and DIN EN 1996
„We need qualified personnel to manage the complex tasks in the future infrastructure planning.“
CEO Frank Mantel
Our new office spaces
The new office building in Rosenstrasse in Margetshöchheim offers our employees plenty of room and optimal working conditions.
Optimizing the PUR plate
As a consulting engineering firm, we are supporting Deutsche Telekom in optimizing the cable duct entry plate made of reinforced polyurethane integral foam for large concrete shafts.
Trip to the precast plant
In 2025 we went to the precast plant in Luckenwalde with the MF Engineering team. The focus was on exchanging technical experience with employees from Köhler Beton.