New development of 28 steel support structures for a gas insulated switchgear in Algeria (height: approx. 2-5m)
Customer:
ABB Schweiz AG
Service:
Structural calculation and design drawings of the steel support structures acc. to AISC ASD and structural check of the gas filled Aluminium pipes (with earthquake loading)
„We need qualified personnel to manage the complex tasks in the future infrastructure planning.“
CEO Frank Mantel
New set of jerseys for the children of the soccer club
As an enterprise in Margetshöchheim, the development of our town matters to us. Thus, we support the local soccer club with this new set of jerseys.
Optimizing the cable duct entry plate
As a consulting engineering firm, we are supporting Deutsche Telekom in optimizing the cable duct entry plate made of reinforced polyurethane integral foam for large concrete shafts.
Trip to the precast plant
We've had two informative and interesting days. We went to the precast plant in Luckenwalde with the MF Engineering team. The focus was on exchanging technical experience with employees from Köhler Beton.