Plant Engineering – Components for Biogas and Power Plants

Satisfied customers are our best recommendation! Here you will find a selection of our projects, which reflect the comprehensive range of services of MF Engineering.

Anlagenbau – Biogas Substratbarriere

Biogas Substrate Barrier

New development of a substrate barrier for containment of the dry substrate. Measurements approx. 2.5 m x 4.0 m

  • Schmack Biogas GmbH
  • Structural calculation of the substrate barrier acc. to EC3
    Anlagenbau – Biogas Pumpenkonsole

    Biogas Pump Brackets

    Proof of brackets for installation of an eccentric spiral pump at the concrete wall of a fermenter

  • Schmack Biogas GmbH
  • Structural calculation/optimisation of the brackets in regards to carrying capacity and fatigue under consideration of the dynamic load acc. to DIN EN 1993 and VDI 2230
    Anlagenbau – Biogas Substratbunker

    Biogas Substrate Bunker

    New development of a hydraulic to open cover made of stainless steel for a substrate bunker. Measurements approx. 11.5m x 4.0 m x 1.6m

  • Schmack Biogas GmbH
  • Structural calculation of the cover in several opening positions acc. to EC3
    Anlagenbau – Fermenter Abdeckplatte

    Fermenter Cover Plate

    New development of a cover plate loaded by 800 mbar overpressure

  • Schmack Biogas GmbH
  • Structural calculation of the cover plate acc. to EC3 and anchoring in concrete acc. to ETAG
    Anlagenbau – Katalysator für Gaskraftwerke

    Catalyst for Gas Power Plants

    New development of a catalyst module for gas power plants

  • Johnson Matthey Catalysts (Germany) GmbH
  • Structural calculation and design of a steel frame structure for catalysts under earthquake loading acc. to ASCE 7-05, IBC 2009, AISC 360-10
    Anlagenbau – Katalysator für Gaskraftwerke

    Catalyst for Gas Power Plants

    New development of a catalyst module for gas power plants

  • Johnson Matthey Catalysts (Germany) GmbH
  • Structural calculation and design of a structure consisting of several modules made of welded steel plates under earthquake loading acc. to DIN EN1998 and DIN EN 1993, analyses for different materials (structural steel, boiler steel, stainless steel)
    Anlagenbau – Katalysator für Gaskraftwerk TVA Paradise

    Catalyst for Gas Power Plant TVA Paradise

    Enhancement of an existing Catalyst module for a new gas power plant

  • Johnson Matthey Catalysts (Germany) GmbH
  • Structural calculation and design of a steel frame structure for catalysts under earthquake loading acc. to ASCE 7-05, IBC 2009, AISC 360-10
    Anlagenbau – Katalysator für Gaskraftwerk TVA Allen

    Catalyst for Gas Power Plant TVA Allen

    Enhancement of an existing Catalyst module for a new gas power plant

  • Johnson Matthey Catalysts (Germany) GmbH
  • Structural calculation and design of a steel frame structure for catalysts under earthquake loading acc. to ASCE 7-10, IBC 2012, AISC 360-10
    Anlagenbau – Katalysator für Gaskraftwerk Fuji MPP Moka

    Catalyst for Gas Power Plant Fuji MPP Moka

    Enhancement of an existing Catalyst module for a new gas power plant in Japan

  • Johnson Matthey Catalysts (Germany) GmbH
  • Structural calculation and design of a steel frame structure for catalysts under earthquake loading acc. to DIN EN 1993
    Anlagenbau – Waschanlage für Windkraftwerke

    Washing-bay for Wind Power Station

    New development of a transport wagon for a washing-bay for parts of wind power stations

  • Zippel GmbH
  • Structural calculation and design of the steel frame structure oft he transport wagon as well as pre-design of the runway girders acc. to DIN EN 1993-1 and DIN 1993-3
    Anlagenbau – Umbau Kraftwerk Würzburg

    Alteration Power Plant Würzburg

    Reorganisation of the former Würzburger coal power plant into a modern gas and steam power plant

  • W + G Ingenieurgesellschaft mbH
  • Structural calculation and check of a flue gas duct with overpressure
    Anlagenbau – Moneypoint Generating Station

    Moneypoint Generating Station

    Alteration of a power plant (915 MW) in Ireland

  • W + G Ingenieurgesellschaft mbH / Lurgi Lentjes
  • Structural calculation and check of a flue gas duct
    Anlagenbau – Maasvlakte Power Plant 3

    Maasvlakte Power Plant 3

    New development of two assembly frames for transport, assembly and revision of large valves

  • Lisega SE / E.ON Kraftwerke AG
  • Structural calculation acc. to DIN 18800 and workshop drawings of the assembly frames