Plant Engineering – Electrical Facilities

Satisfied customers are our best recommendation! Here you will find a selection of our projects, which reflect the comprehensive range of services of MF Engineering.

Anlagenbau – Transformatoren 380/220KV Lavorgo

Transformers 380/220KV Lavorgo

New development of 3 transformers 380/220KV incl. resin jacketed bus bars in Switzerland

  • MGC Moser-Glaser AG
  • Seismic calculation (response spectrum method) of the fastening structures and the resin jacketed busbars acc. to IEC 62271-207
    Anlagenbau – Transformatoren 380/220kV UW Châtelard

    Transformers 380/220kV UW Châtelard

    New development of transformers 380/220KV incl. resin jacketed bus bars in Switzerland

  • MGC Moser-Glaser AG
  • Seismic calculation (response spectrum method) of the fastening structures and the resin jacketed busbars acc. to IEC 62271-207
    Anlagenbau – Transformatoren 12kV Formosa

    Transformers 12kV Formosa

    New development of transformers 12kV/1250A & 12kV/3150A incl. resin jacketed bus bars in Taiwan

  • MGC Moser-Glaser AG
  • Seismic calculation (quasi-static) of the fastening structures and the resin jacketed busbars
    Anlagenbau – Transformatoren 24kV Full Power Energy

    Transformers 24kV Full Power Energy

    New development of transformers 24kV / 2000 A / 2×4000 A incl. resin jacketed bus bars in Taiwan

  • MGC Moser-Glaser AG
  • Structural calculation and design of the fastening structures and the resin jacketed busbars under seismic loading
    Anlagenbau – Transformatoren 17,5kV Formosa Refinery

    Transformers 17,5kV Formosa Refinery

    New development of transformers 17.5kV / 2×2000 A / 2×4000 A incl. resin jacketed bus bars in Taiwan

  • MGC Moser-Glaser AG
  • Structural calculation and design of the fastening structures and the resin jacketed busbars under seismic loading
    Anlagenbau – Transformatoren 36kV Siemens

    Transformers 36kV Siemens

    New development of transformers 36kV / 5000 A incl. resin jacketed bus bars in Laufenburg, Switzerland

  • MGC Moser-Glaser AG
  • Structural calculation and design of the fastening structures and the resin jacketed busbars under seismic loading
    Anlagenbau – Transformatoren 36kV

    Transformers 36kV

    New development of transformers 36kV / 2500 A incl. resin jacketed bus bars in Oman

  • MGC Moser-Glaser AG
  • Structural calculation and design of the fastening structures and the resin jacketed busbars under seismic loading acc. to IBC 2009 and ASCE 7-05
    Anlagenbau – Transformatoren 36kV

    Transformers 36kV

    New development of transformers 36kV / 2000 A / 4000 A incl. resin jacketed bus bars in Peru

  • MGC Moser-Glaser AG
  • Structural calculation and design of the fastening structures and the resin jacketed busbars under seismic loading
    Anlagenbau – Transformatoren 17,5kV

    Transformers 17,5kV

    New development of transformers 17,5kV / 1250 A / 4500 A incl. resin jacketed bus bars in Wägital, Schweiz

  • MGC Moser-Glaser AG
  • Structural calculation and design of the fastening structures and the resin jacketed busbars under seismic loading
    Anlagenbau – Transformatoren 24kV

    Transformers 24kV

    New development of transformers 24kV / 2500 A incl. resin jacketed bus bars in Gaston, USA

  • MGC Moser-Glaser AG
  • Structural calculation and design of the fastening structures and the resin jacketed busbars under seismic loading acc. to ASCE 7-16
    Anlagenbau – Transformatoren 36kV

    Transformers 36kV

    New development of transformers 36kV / 2000 A incl. resin jacketed bus bars in Belle Chasse, USA

  • MGC Moser-Glaser AG
  • Structural calculation and design of the fastening structures and the resin jacketed busbars under seismic loading acc. to ASCE 7-16
    Anlagenbau – Transformatoren 17,5kV

    Transformers 17,5kV

    New development of transformers 17,5kV / 6300 A incl. resin jacketed bus bars in La Bâtiaz, Schweiz

  • MGC Moser-Glaser AG
  • Structural calculation and design of the fastening structures and the resin jacketed busbars under seismic loading acc. to ESTI 248, version 0415 d
    Anlagenbau – Transformatoren 17,5kV

    Transformers 17,5kV

    New development of transformers 17,5kV / 2000 A incl. resin jacketed bus bars at Robert Kerr Dam, USA

  • MGC Moser-Glaser AG
  • Structural calculation and design of the fastening structures and the resin jacketed busbars under seismic loading acc. to ASCE 7-16 incl. anchorages acc. to ACI 318-14
    Anlagenbau – Transformatoren 17,5kV

    Transformers 17,5kV

    New development of transformers 17,5kV / 1250 A, 1600 A incl. resin jacketed bus bars in Leibstadt, Schweiz

  • MGC Moser-Glaser AG
  • Structural calculation and design of the fastening structures and the resin jacketed busbars under seismic loading acc. to KTA 2201.4 as well as GKSL-Nr. L1000
    Anlagenbau – Transformatoren 123kV

    Transformers 123kV

    New development of transformers 123kV / 3150 A incl. resin jacketed bus bars in Boston, USA

  • MGC Moser-Glaser AG
  • Structural calculation and design of the fastening structures and the resin jacketed busbars under seismic loading acc. to ASCE 7-16
    Anlagenbau – Cube Incinerator 12kV, Taiwan

    Cube Incinerator 12kV, Taiwan

    New development of the Taiwan Cube Incinerator 12kV / 1600A / 1000A incl. resin jacketed bus bars

  • MGC Moser-Glaser AG
  • Structural calculation and design of the fastening structures and the resin jacketed busbars under seismic loading
    Anlagenbau – Hyosung S-Oil Shaheen, Südkorea

    Hyosung S-Oil Shaheen, South Korea

    Assembly of resin jacketed bus bars 36kV / 4000A

  • MGC Moser-Glaser AG
  • Structural calculation and design of the fastening structures and the resin jacketed busbars under seismic loading acc. to IBC and ASCE 7, Occupancy Category IV as well as design of the anchorage acc. to EN 1992-4
    Anlagenbau – Stromschienen in Swansea, Wales

    Duresca Busbars in Swansea, Wales

    Steel support structure for resin jacketed bus bars 36kV / 4000A

  • MGC Moser-Glaser AG
  • Structural calculation and design of the steel support structure under wind, snow and seismic loading acc. to EN 1991-1 and EN 1998-1 as well as design of the anchorage acc. to EN 1992-4
    Anlagenbau – Generatorableitung KW Ritom G1, Schweiz

    Generator Busduct KW Ritom G1, Switzerland

    Assembly of resin jacketed bus bars 17,5kV / 3150A / 6300A

  • MGC Moser-Glaser AG
  • Structural calculation and design of the fastening structures and the resin jacketed busbars under seismic loading acc. to SIA 261
    Anlagenbau – Stromschienen für Howard, Panama

    Duresca Busbars for Howard, Panama

    Assembly of resin jacketed bus bars 36kV / 2500A

  • MGC Moser-Glaser AG
  • Structural calculation and design of the fastening structures and the resin jacketed busbars under seismic loading acc. to REP 2021
    Anlagenbau – Stromschienen in Upper Boat, Wales

    Duresca Busbars in Upper Boat, Wales

    Steel support structure for resin jacketed bus bars

  • MGC Moser-Glaser AG
  • Structural calculation and design of the steel support structure under wind and snow load acc. to EN 1991-1 as well as design of the anchorage acc. to EN 1992-4
    Anlagenbau – Inch Cape Offshore Wind Farm in GB

    Inch Cape Offshore Wind Farm in GB

    New development of Moray West Offshore Wind Farm, North Sea, GB

  • MGC Moser-Glaser AG
  • Structural calculation and optimisation of the fastening structures as well as determination of support loads for wind, ice and offshore loading
    Anlagenbau – Changhua Offshore Wind Farm in Taiwan

    Changhua Offshore Wind Farm in Taiwan

    New development of the Greater Changhua Offshore Wind Farm, Taiwan

  • MGC Moser-Glaser AG
  • Structural calculation and optimisation of the fastening structures as well as determination of support loads for seismic loading acc. to IEEE 693