New development of a steel structure to be used as emergency exit on an adjoining building of the Steinbachtal School
Customer:
Stadt Würzburg
Service:
Structural analysis and design of a steel bridge with staircase incl. proof of the load transfer into the concrete structure of the existing building acc. to DIN EN 1993-1 and DIN EN 1992
„We need qualified personnel to manage the complex tasks in the future infrastructure planning.“
CEO Frank Mantel
Our new office spaces
The new office building in Rosenstrasse in Margetshöchheim offers our employees plenty of room and optimal working conditions.
Optimizing the PUR plate
As a consulting engineering firm, we are supporting Deutsche Telekom in optimizing the cable duct entry plate made of reinforced polyurethane integral foam for large concrete shafts.
Trip to the precast plant
In 2025 we went to the precast plant in Luckenwalde with the MF Engineering team. The focus was on exchanging technical experience with employees from Köhler Beton.