New development of a dedusting plant (height 26 m, width 21 m, length 30 m), investigation of support structure, penthouse and stair tower
Customer:
Babcock Noell GmbH
Service:
Structural calculation and design of the supporting steel structure of the plant inclusive connection design acc. to ASCE 7-05, UBC 1997 and AISC 360-05
„We need qualified personnel to manage the complex tasks in the future infrastructure planning.“
CEO Frank Mantel
New set of jerseys for the children of the soccer club
As an enterprise in Margetshöchheim, the development of our town matters to us. Thus, we support the local soccer club with this new set of jerseys.
We’ve moved!
At the end of 2024 we were finally able to move into the new office building. Here our employees have plenty of space and optimal working conditions. We look forward to your visit!
Optimizing the cable duct entry plate
As a consulting engineering firm, we are supporting Deutsche Telekom in optimizing the cable duct entry plate made of reinforced polyurethane integral foam for large concrete shafts.