Sprache auswählen:

Sprache auswählen:

Umwelttechnik – Entstaubungsanlage in Malaysia

New development of a dedusting plant (height 26 m, width 21 m, length 30 m), investigation of support structure, penthouse and stair tower

Customer:

Babcock Noell GmbH

Service:

Structural calculation and design of the supporting steel structure of the plant inclusive connection design acc. to ASCE 7-05, UBC 1997 and AISC 360-05

Back to overview

All references in one PDF

Get in touch
with our team now!

    Your name *

    Your e-mail-adress *

    Subject

    Your message

    MF Engineering will use all data provided here in accordance with the Privacy Policy.