Proof of an existing structure of reinforced concrete under loads due to a crane and stand jack facility (approx. 200 t), retrofitting of the concrete ceiling with CFK lamination
Customer:
RWE Power AG
Service:
Structural calculation of the ceiling of reinforced concrete B300 / St IIIb acc. to DIN EN 1992 as well as check of the existing reinforcement
„We need qualified personnel to manage the complex tasks in the future infrastructure planning.“
CEO Frank Mantel
Our new office spaces
The new office building in Rosenstrasse in Margetshöchheim offers our employees plenty of room and optimal working conditions.
Optimizing the PUR plate
As a consulting engineering firm, we are supporting Deutsche Telekom in optimizing the cable duct entry plate made of reinforced polyurethane integral foam for large concrete shafts.
Trip to the precast plant
In 2025 we went to the precast plant in Luckenwalde with the MF Engineering team. The focus was on exchanging technical experience with employees from Köhler Beton.