New development of support structures for the assembly of a new reactor building crane
Customer:
Uniper Anlagenservice GmbH
Service:
Structural calculation and design of load attachment points at the containment spherical shell (15 t lifting load) and rails on the former crane bridge girder acc. to DIN EN 1993 and VDI 2230, application of “fluid” metal MM1018FL
„We need qualified personnel to manage the complex tasks in the future infrastructure planning.“
CEO Frank Mantel
New set of jerseys for the children of the soccer club
As an enterprise in Margetshöchheim, the development of our town matters to us. Thus, we support the local soccer club with this new set of jerseys.
Optimizing the cable duct entry plate
As a consulting engineering firm, we are supporting Deutsche Telekom in optimizing the cable duct entry plate made of reinforced polyurethane integral foam for large concrete shafts.
Trip to the precast plant
We've had two informative and interesting days. We went to the precast plant in Luckenwalde with the MF Engineering team. The focus was on exchanging technical experience with employees from Köhler Beton.