Erection of a temporary load distribution frame for parts of a crane to be assembled during refurbishment activities at the reactor building crane
Customer:
NKM Noell Special Cranes GmbH
Service:
Structural calculation, frequency analysis and iterative optimisation of the load distribution frame to be designed for earthquake loading acc. to DIN 15018, KTA 2201 und DIN EN 1993
„We need qualified personnel to manage the complex tasks in the future infrastructure planning.“
CEO Frank Mantel
New set of jerseys for the children of the soccer club
As an enterprise in Margetshöchheim, the development of our town matters to us. Thus, we support the local soccer club with this new set of jerseys.
Optimizing the cable duct entry plate
As a consulting engineering firm, we are supporting Deutsche Telekom in optimizing the cable duct entry plate made of reinforced polyurethane integral foam for large concrete shafts.
Trip to the precast plant
We've had two informative and interesting days. We went to the precast plant in Luckenwalde with the MF Engineering team. The focus was on exchanging technical experience with employees from Köhler Beton.