New development of two steel halls for temporary enclosure of the reactor pools during the assembly period
Customer:
Babcock Noell GmbH
Service:
Structural calculation of the halls acc. to DIN 18800 each comprising of two parts with removable roof elements which can be lifted into the building with the crane
„We need qualified personnel to manage the complex tasks in the future infrastructure planning.“
CEO Frank Mantel
Our new office spaces
The new office building in Rosenstrasse in Margetshöchheim offers our employees plenty of room and optimal working conditions.
Optimizing the PUR plate
As a consulting engineering firm, we are supporting Deutsche Telekom in optimizing the cable duct entry plate made of reinforced polyurethane integral foam for large concrete shafts.
Trip to the precast plant
In 2025 we went to the precast plant in Luckenwalde with the MF Engineering team. The focus was on exchanging technical experience with employees from Köhler Beton.