New development of pipe bridges for pipes and cable trays in a brewery in the USA
Customer:
Steinecker GmbH
Service:
Structural calculation of the pipe bridges and steel support structures incl. connection details of the anchored column feet acc. to AISC 360 under wind and seismic loads acc. to ASCE 7
„We need qualified personnel to manage the complex tasks in the future infrastructure planning.“
CEO Frank Mantel
Our new office spaces
The new office building in Rosenstrasse in Margetshöchheim offers our employees plenty of room and optimal working conditions.
Optimizing the PUR plate
As a consulting engineering firm, we are supporting Deutsche Telekom in optimizing the cable duct entry plate made of reinforced polyurethane integral foam for large concrete shafts.
Night of Academy in Cologne
An inspiring exchange high above the rooftops of Cologne: Set in an exclusive ambiance, this year’s Night of Academy focused on current challenges and solutions in broadband and network expansion.