Calculation of steam and condensate pipe lines (operating temperature of 184°C, pressure 8 bar)
Customer:
GEA Brewery Systems GmbH
Service:
Structural calculation and proof of the pipes under pressure, dead load and temperature as well as wind snow and earthquake acc. to EN 13480 Part 3 - 2017, RU SP 20.13330 and UBC 1997
„We need qualified personnel to manage the complex tasks in the future infrastructure planning.“
CEO Frank Mantel
New set of jerseys for the children of the soccer club
As an enterprise in Margetshöchheim, the development of our town matters to us. Thus, we support the local soccer club with this new set of jerseys.
Optimizing the cable duct entry plate
As a consulting engineering firm, we are supporting Deutsche Telekom in optimizing the cable duct entry plate made of reinforced polyurethane integral foam for large concrete shafts.
Trip to the precast plant
We've had two informative and interesting days. We went to the precast plant in Luckenwalde with the MF Engineering team. The focus was on exchanging technical experience with employees from Köhler Beton.