Calculation of steam and condensate pipe lines (operating temperature of 184°C, pressure 8 bar)
Customer:
GEA Brewery Systems GmbH
Service:
Structural calculation and proof of the pipes under pressure, dead load and temperature as well as wind snow and earthquake acc. to EN 13480 Part 3 - 2017, RU SP 20.13330 and UBC 1997
„We need qualified personnel to manage the complex tasks in the future infrastructure planning.“
CEO Frank Mantel
Our new office spaces
The new office building in Rosenstrasse in Margetshöchheim offers our employees plenty of room and optimal working conditions.
Optimizing the PUR plate
As a consulting engineering firm, we are supporting Deutsche Telekom in optimizing the cable duct entry plate made of reinforced polyurethane integral foam for large concrete shafts.
Trip to the precast plant
In 2025 we went to the precast plant in Luckenwalde with the MF Engineering team. The focus was on exchanging technical experience with employees from Köhler Beton.