New development of a platform structure with three levels for the installation of the conveyance of an Aluminium plant in Saudi Arabia (measurements approx. 7.5m x 25m x 37.5m)
Customer:
NKM Noell Special Cranes
Service:
Structural and seismic calculation and connection design acc. to EC3 as well as workshop drawings
„We need qualified personnel to manage the complex tasks in the future infrastructure planning.“
CEO Frank Mantel
Our new office spaces
The new office building in Rosenstrasse in Margetshöchheim offers our employees plenty of room and optimal working conditions.
Optimizing the PUR plate
As a consulting engineering firm, we are supporting Deutsche Telekom in optimizing the cable duct entry plate made of reinforced polyurethane integral foam for large concrete shafts.
Trip to the precast plant
In 2025 we went to the precast plant in Luckenwalde with the MF Engineering team. The focus was on exchanging technical experience with employees from Köhler Beton.