Proof of brackets for installation of an eccentric spiral pump at the concrete wall of a fermenter
Customer:
Schmack Biogas GmbH
Service:
Structural calculation/optimisation of the brackets in regards to carrying capacity and fatigue under consideration of the dynamic load acc. to DIN EN 1993 and VDI 2230
„We need qualified personnel to manage the complex tasks in the future infrastructure planning.“
CEO Frank Mantel
Our new office spaces
The new office building in Rosenstrasse in Margetshöchheim offers our employees plenty of room and optimal working conditions.
Optimizing the PUR plate
As a consulting engineering firm, we are supporting Deutsche Telekom in optimizing the cable duct entry plate made of reinforced polyurethane integral foam for large concrete shafts.
Trip to the precast plant
In 2025 we went to the precast plant in Luckenwalde with the MF Engineering team. The focus was on exchanging technical experience with employees from Köhler Beton.