New development of a gantry with enclosure for a 120 t crane for relocating Castor vessels during the disassembly of the power plant
Customer:
NKM Noell Special Cranes GmbH
Service:
Structural calculation and design of the steel structure acc. to DIN EN 1991, KTA 3902, DIN 15018-1 and DASt 010 as well as proof of stability against overturning acc. to DIN 15019-1
„We need qualified personnel to manage the complex tasks in the future infrastructure planning.“
CEO Frank Mantel
Our new office spaces
The new office building in Rosenstrasse in Margetshöchheim offers our employees plenty of room and optimal working conditions.
Optimizing the PUR plate
As a consulting engineering firm, we are supporting Deutsche Telekom in optimizing the cable duct entry plate made of reinforced polyurethane integral foam for large concrete shafts.
Night of Academy in Cologne
An inspiring exchange high above the rooftops of Cologne: Set in an exclusive ambiance, this year’s Night of Academy focused on current challenges and solutions in broadband and network expansion.