Fabrication and assembly of a lifting system for the disassembly of the reactor pressure vessel
Customer:
E.ON Anlagenservice
Service:
Structural calculation of a moving equipment with strand jack as well as a lifting platform with rotary table and other auxiliary structures acc. to DIN EN 13001 and DIN EN 1993-1
„We need qualified personnel to manage the complex tasks in the future infrastructure planning.“
CEO Frank Mantel
Our new office spaces
The new office building in Rosenstrasse in Margetshöchheim offers our employees plenty of room and optimal working conditions.
Optimizing the PUR plate
As a consulting engineering firm, we are supporting Deutsche Telekom in optimizing the cable duct entry plate made of reinforced polyurethane integral foam for large concrete shafts.
Night of Academy in Cologne
An inspiring exchange high above the rooftops of Cologne: Set in an exclusive ambiance, this year’s Night of Academy focused on current challenges and solutions in broadband and network expansion.